IPB

Welcome Guest ( Log In | Register )

UPGRADE TO ALL-ACCESS! GET UNLIMITED MULTIMEDIA DOWNLOADS, POST IN FORUMS, SPACE CHAT, MORE. CLICK FOR MORE INFORMATION
 
Reply to this topicStart new topic
STS-122 MCC Status Report #05
Matt
post Aug 20 2008, 07:52 PM
Post #1


Administrator
***

Group: Root Admin
Posts: 781
Joined: 10-August 08
Member No.: 1



STS-122
Report #05
Saturday, February 9, 2008 - 5:30 p.m. CST
Mission Control Center, Houston, Texas

HOUSTON ú Space shuttle Atlantis delivered the European Space Agencyús Columbus science laboratory to the International Space Station today, but the actual installation of the module will be delayed by one day.

What wasnút delayed, however, was the official crew rotation of ESA Astronaut Leopold Eyharts and Expedition 16 Flight Engineer Dan Tani, which was completed at 5:20 p.m. Eyharts now is a member of Expedition 16 and Tani is an STS-122 mission specialist.

Expedition 16 Commander Peggy Whitson and Flight Engineers Yuri Malenchenko and Tani welcomed the seven-man Atlantis crew into the space station at 12:40 p.m., following an 11:17 a.m. docking, following a flawless rendezvous throughout the morning.

Theyúll have 24 extra hours to finish preparing for the missionús next major milestone, however, due to a crew medical issue. The missionús first spacewalk originally was scheduled for Sunday, but has been postponed until Monday. Mission Specialist Rex Walheim will be joined for the spacewalk by Mission Specialist Stanley Love, rather than Mission Specialist Hans Schlegel, as originally planned.

Space Shuttle Program Deputy Manager John Shannon said ground teams are currently reworking the mission timeline and there should be no impact to the completion of the missionús objectives, despite being shifted one day later.

To make up for the delay, Shannon said the crew will conserve enough power to spend an additional day in space. Atlantis went into orbit with the option of adding one day to its mission, which was to be used for additional work commissioning the new Columbus module. By adding a second day, the crew could shift their activities by one day and still have time for more Columbus work after the module is installed.

Before docking, Commander Steve Frick flew the shuttle through a backflip to allow the space station crew a good view of Atlantisú heat shield. Whitson and Malenchenko took about 300 photos of the shuttleús thermal protection system and sent them down to teams on the ground for analysis.

The teams also are paying close attention to photos sent down by the crew Friday of minor damage to a thermal blanket over the shuttleús right Orbital Maneuvering System pod. A similar condition occurred on the left pod last year on STS-117 and was repaired during a spacewalk.

Shannon said this case does not seem to be as much of a concern, because this particular blanket location does not experience as much heat during the shuttleús reentry.

Docking went smoothly with the exception of a hiccup with one of the stationús five general purpose computers. After experiencing some problems with guidance and navigation software on the computer, the crew opted to use other computers for the shuttleús rendezvous with the station. Only one computer is needed to perform the rendezvous, with one computer required for backup. Mission Control will review the computerús software to ensure its health.

The next STS-122 status report will be issued Sunday morning or earlier if events warrant.
Go to the top of the page
 
+Quote Post
Googlebot
post Aug 20 2008, 07:52 PM
Post #












> Google Ads

Go to the top of the page
 
Quote Post

Reply to this topicStart new topic
Tags
No Tag inserted yet

1 User(s) are reading this topic (1 Guests and 0 Anonymous Users)
0 Members:

 



Watch the latest videos on YouTube.com
Lo-Fi Version | SEO by MinervaSEO © Icelabz.net Time is now: 7th February 2012 - 09:50 PM
This forum website is a component of The Spacearium. This website is not affiliated with the National Aeronautics and Space Administration, United States Department of Defense, or any of its associated contractor and sub-contractor corporations. Content herein does not imply any endorsement by the aforementioned parties nor does it consitute an endorsement of those parties by The Spacearium. Website content is either the copyrighted intellectual property of The Spacearium or is in the public domain. Content may not be redistributed or posted on any other website without the express written permission from The Spacearium.

Copyright © 2008, ARES Institute, Inc., aresinstitute.org