IPB

Welcome Guest ( Log In | Register )

UPGRADE TO ALL-ACCESS! GET UNLIMITED MULTIMEDIA DOWNLOADS, POST IN FORUMS, SPACE CHAT, MORE. CLICK FOR MORE INFORMATION
2 Pages V  < 1 2  
Reply to this topicStart new topic
Flight Day 12: EVA #4 And P6 Repair Updates
Matt
post Aug 19 2008, 08:08 PM
Post #11


Administrator
***

Group: Root Admin
Posts: 781
Joined: 10-August 08
Member No.: 1



11:09 a.m. EDT - Array deployment beginning now
Go to the top of the page
 
+Quote Post
Googlebot
post Aug 19 2008, 08:08 PM
Post #












> Google Ads

Go to the top of the page
 
Quote Post
Matt
post Aug 19 2008, 08:09 PM
Post #12


Administrator
***

Group: Root Admin
Posts: 781
Joined: 10-August 08
Member No.: 1



11:15 a.m. EDT - Array deployment going very smoothly a half bay at a time.
Go to the top of the page
 
+Quote Post
Matt
post Aug 19 2008, 08:09 PM
Post #13


Administrator
***

Group: Root Admin
Posts: 781
Joined: 10-August 08
Member No.: 1



11:22 a.m. EDT - The P6 solar array deployment has been successfully completed. The cufflink straps appear to be taking the tension load. After getting a quick look to ensure the panels are in a good configuration, mission control will send a command to take the arrays to full tension and complete today's repair effort.
Go to the top of the page
 
+Quote Post
Matt
post Aug 19 2008, 08:09 PM
Post #14


Administrator
***

Group: Root Admin
Posts: 781
Joined: 10-August 08
Member No.: 1



11:40 a.m. EDT - Scott Parazynski will be moved back to "structure" where he will be able to dismount the OBSS and return to the relative safety of the main structure of the space station.
Go to the top of the page
 
+Quote Post
Matt
post Aug 19 2008, 08:09 PM
Post #15


Administrator
***

Group: Root Admin
Posts: 781
Joined: 10-August 08
Member No.: 1



12:40 p.m. EDT - Ground controllers have been using cameras on the outside of the space station to try to locate a tool that has gotten away from Parazynski and floated off into its own orbit. Apparently, it is a pair of wire cutters.
Go to the top of the page
 
+Quote Post
Matt
post Aug 19 2008, 08:09 PM
Post #16


Administrator
***

Group: Root Admin
Posts: 781
Joined: 10-August 08
Member No.: 1



1:13 p.m. EDT - Both Parazynski and Wheelock are inside the airlock now and the hatch has been closed as they continue to wrap up today's spacewalk.
Go to the top of the page
 
+Quote Post
Matt
post Aug 19 2008, 08:10 PM
Post #17


Administrator
***

Group: Root Admin
Posts: 781
Joined: 10-August 08
Member No.: 1



1:23 p.m. EDT - EVA #4 has officially, and successfully concluded. The official end of EVA is marke by when the airlock repressurization begins, what occurred at 1:22 p.m. EDT for a total EVA duration of 7 hours and 19 minutes.
Go to the top of the page
 
+Quote Post

2 Pages V  < 1 2
Reply to this topicStart new topic
Tags
No Tag inserted yet

1 User(s) are reading this topic (1 Guests and 0 Anonymous Users)
0 Members:

 



Watch the latest videos on YouTube.com
Lo-Fi Version | SEO by MinervaSEO © Icelabz.net Time is now: 7th February 2012 - 09:45 PM
This forum website is a component of The Spacearium. This website is not affiliated with the National Aeronautics and Space Administration, United States Department of Defense, or any of its associated contractor and sub-contractor corporations. Content herein does not imply any endorsement by the aforementioned parties nor does it consitute an endorsement of those parties by The Spacearium. Website content is either the copyrighted intellectual property of The Spacearium or is in the public domain. Content may not be redistributed or posted on any other website without the express written permission from The Spacearium.

Copyright © 2008, ARES Institute, Inc., aresinstitute.org